The Project

Fairmont Industrial Center development is on a 14 site. The development has a total of 86,870 square feet manufacturing facilities. The buildings range from 28’ eave height to 32’ eave height and are 20-ton capable. 

The Challenge

The site originally started out as a nature trail for the community. Vigavi had to pull utilities to the site, extend the parks drive and install regional detention. 

The Solution

Vigavi approaches all developments with an incremental approach. Vigavi started with park with a speculative building which lease almost immediately on completion. Planning was all incremental to maximize usability for future users The detention was put in to only serves one building. As more buildings were development the detention was extended to accommodate. Using the incremental approach Vigavi was able to save on deploying unneeded capital up front and save on carry cost. 

 

  

Project location

Project Features

  • 86,870 sf
  • 14 acres
  • 20 ton crane capable
  • Regional Detention